zyntel
Product · Overview

Drive the engine.

The card below walks the same five steps as the live demo. The first three run on a working model. Answer two questions, watch your twin build, push a change through it.

Steps four and five respond to your choice too, on a sample organisation's numbers rather than a live simulation.

From your questionnaire to a report you can act on, in five steps

Questionnaire · pre-filled here, detailed in the real thingStep 1 of 5
Where does it stall most often? Pick one.
Who are the core actors? Pick up to three.
Your answers · modelledlive model
Plate 03 · built from step onetap any node or line
NextStep 3 of 5

Try a change

PathwaysScenarios

Describe a decision, event, or shock. The twin projects how it ripples through the system over the next 12 months.

A senior leader leaves the organisation
The counts above the card move against your baseline from step one.
Three moves worth tryingStep 4 of 5

Sit with them side by side. Pick the one you'd try first. The brief writes itself around your choice.

Same goal, different order of moves, with the consequences priced before you pay for them.
DTO Brief · EmberPath
Export PDFShare link

From quarterly fire-fighting to a published cadence.

EmberPath · 51–200 people, climate hardware. Modular residential heat pumps; Lisbon HQ, assembly outside Porto.

Primary pathway · this is what your choice rewrote
Sustainable ramp: capacity + intensity together
Horizon60–90 days
CapEx€4.2M
RiskMedium
Confidence58%
The first 30 days
    What it does not fix
    Three findings · the diagnosis, the same whichever path you pick
    01 · Decisions stall at cross-functional boundariesThree €4M+ items held at the Investment Committee for over a quarter, waiting on one Works Council reading.
    02 · Evidence cadence lags the executive cadenceSignals emit weekly; the committee reads quarterly. Two-thirds of approved items cite data the sponsor hadn't seen.
    03 · Procurement is the unmodelled riskScope-3 attestation rests on 14 tier-2 suppliers with no binding cadence, and each unresolved week widens the band ~3%.
    The real brief is built from your answers, and emailed to you. Run it on your organisation →

    1.Fill in the questionnaire

    The real intake is detailed: 20–30 minutes per stakeholder, because the model is only as honest as your answers. Here it comes pre-filled; retap to make it yours.

    2.Your system map is built

    Tension burns orange. Strengths hold green. Drifting shows gold early, a warning signal before it becomes a problem. Your actors carry a white ring. Zoom from system to people.

    3.Try a change

    A decision, an event, a shock. Describe it or pick a card, and watch it ripple through the next twelve months. Live, against your own baseline.

    4.Compare pathways

    Three moves, side by side: how long, what it costs, how risky, how sure we are. Pick one; the brief writes itself around your choice.

    5.Receive a report brief

    Findings, your chosen pathway with its trade-off, and a 30-day experiment to start with. Export it, share it, act on it.

    Ozy holds the model. You make the call.
    Not once and done

    The five steps are one lap. The product is the loop.

    A report ages the day it is printed. OZY is built to stay with your organisation and run as a rhythm:

    01 · Measure

    Intake, documents, and what actually changed since the last cycle.

    02 · Analyse

    The twin recomputes: bottleneck hypotheses, risks, and pathway options, each with its evidence.

    03 · Improve

    Pick a pathway, run a 30-day experiment, and watch the early warning signals.

    what you learn feeds the next cycle. The twin remembers.

    Every lap sharpens the model, because it is corrected against what really happened rather than what was planned. The longer OZY lives with your organisation, the harder your organisation is to surprise.

    Why it holds

    Three things the others don't do

    What's inside

    Made for scaling and transformation

    The pilot

    That was the engine on training wheels.

    The full model reads your documents, your questionnaire, your organisation. The MVP goes live in September, and the design partners are shaping what it becomes.

    Two minutes, no sign-up · or read the science behind it first →